
Hydroelectric plants up to 15 MW according to Greek Legislation, are Small Hydroelectric Power Plants. From the stage of hydrological measurements and energy assessment of the location of a project, to the budget analysis and the selection of E/M manufacturers, based on the final preliminary design and the drafting of the contractual documents, until the preparation of the Implementation Study, our company and its partners provide the best quality and reliability. We also undertake the entire E/M part of the auxiliary systems (turnkey), as well as the execution of installation works. From grid to electrification and from testing and commissioning to Operation and Maintenance (O & M), we follow international construction practices and the rules of art and science.